Do You Need a Permit to Replace Your Roof?
Learn when a roof replacement requires a building permit, focusing on structural changes...
Read GuideCheck local building codes, estimate your municipal fees, and review inspection requirements for 2026.
Retrofit windows (inserting into existing frames) often do not require a permit, but new construction windows or altering the wall structure almost always requires an inspection.
In South Carolina, a Window Replacement requires a building permit.
The coastal areas of Horry County are in South Carolina's wind-borne debris region (design winds of 130 mph or more within a mile of the coast; here 140-150 mph), so replacing windows requires a permit and the new windows and doors must be impact-rated (ASTM E1996 large-missile test) or protected by approved shutters. South Carolina defines these zones with county wind maps, and a licensed engineer's seal may be needed for the load path in high-wind areas. Plans are reviewed under the Horry County, SC (WBDR) code (IRC 2021 SCRC); apply through Myrtle Beach Building Permits before work begins.
Source: Horry County, SC (WBDR), IRC 2021 SCRC · County-specific · Verified 2026 by StateDataIndex
With a growing population of around 383,016 residents, Horry County maintains a relatively streamlined permitting process compared to major urban hubs. Processing typically takes 1 to 3 weeks.
Because South Carolina sits in a hurricane-prone zone, the South Carolina Building Codes requires exterior work to use wind-rated materials and proper anchoring (such as tie-downs and impact-rated components) to pass inspection.
For Horry County residents, we highly recommend reviewing your neighborhood HOA covenants before paying any municipal fees. Often, homeowners associations maintain stricter rules regarding materials and dimensions for your Window Replacement than the county itself.
South Carolina zoning is managed at the county and municipal level, with coastal regions heavily regulating development to protect against hurricane storm surges. Fortunately, South Carolina maintains relatively builder-friendly regulations, keeping base permit fees competitive.
This is a planning estimate only — actual fees in Horry County depend on your project valuation. A typical breakdown looks roughly like:
Always confirm exact fees with your local building department before applying.
*Chart represents median application base fees and does not include project valuation percentages.
Office: Myrtle Beach Building Permits
Address: Myrtle Beach City Services Building, 921 N Oak St, Myrtle Beach, SC 29577, USA
Phone: (843) 918-1111
Source: official Horry County government records. Hours and procedures can change — call ahead to confirm.
In Horry County, applications and fees are usually handled through an online permit portal. Your contractor should include their South Carolina Residential Builders Commission license number to avoid rejections.
When applying for a Window Replacement permit, you or your contractor will generally need to submit the following documentation for the city's review:
Key code points for a Window Replacement in Horry County: Replacement windows in bedrooms and sleeping areas must meet strict minimum egress size requirements to allow for emergency fire escape.
Estimated processing time in Horry County: 2 to 4 weeks.
Building without authorization is considered a code violation. The local government can issue a Stop Work Order, forcing you to halt construction immediately. You may be subject to retroactive permit fees (often double the original cost), daily fines, or even a mandate to tear down the unpermitted work at your own expense.
Yes. South Carolina generally allows property owners to act as their own general contractor under an Owner-Builder exemption. If you take this route, you assume full legal and financial liability and must ensure all work complies with the South Carolina Building Codes.
As a planning estimate, base municipal fees for a Window Replacement permit in Horry County typically fall between $51 and $78. The final amount depends on your project valuation, so confirm the exact figure with the local building department.
Based on the size of Horry County, the typical processing time is 2 to 4 weeks. Times vary with the season and the building department application volume.
You can apply through the Myrtle Beach Building Permits or online via the county permit portal. For questions, call (843) 918-1111.
Did you recently pay for a permit here? Anonymously share the fee to help our database stay accurate.
Learn when a roof replacement requires a building permit, focusing on structural changes...
Read GuidePlanning to build a pool? Learn about the complex permit requirements involving soil tests...
Read GuideEverything you need to know about structural safety, legal compliance, and avoiding fines.
Read GuidePopular tools and materials homeowners use for a window replacement project:
As an Amazon Associate, we earn from qualifying purchases.
Planning another home improvement project? Check the requirements and fees for:
Building near the county line? Check requirements for neighboring areas: