7 Critical Mistakes Homeowners Make During the Permitting Process
Starting work before the permit is issued can lead to double fees and stop-work orders.
Read GuideCheck local building codes, estimate your municipal fees, and review inspection requirements for 2026.
Installing a new fence can improve privacy and property value. However, most counties require a permit if the fence exceeds 6 feet in height or is located in the front yard.
In Minnesota, there is no single statewide rule for a Fence Installation; whether you need a permit is decided locally in Washington County.
Fences are governed mainly by local zoning, not a statewide building permit. Cities set height limits (commonly 3-4 ft in front yards and 6 ft in back and side yards), setbacks, and corner sight-line rules, and many require a zoning permit for any fence. Most jurisdictions exempt fences up to 7 ft from a building permit (IRC R105.2) and require one above that. Replacing a fence at the same height, material, and location usually needs no permit; a fence used as a pool barrier always does. Because Minnesota leaves this to local jurisdictions, the reliable answer comes from Washington County Zoning. Zoning setbacks apply either way.
Source: Statewide, IRC 2018 · Verified 2026 by StateDataIndex
With a growing population of around 276,238 residents, Washington County maintains a relatively streamlined permitting process compared to major urban hubs. Processing typically takes 1 to 3 weeks.
Because of severe winter weather in Minnesota, any exterior structures or footings must be set below the local frost line to prevent shifting, as mandated by the Minnesota State Building Code.
For Washington County residents, we highly recommend reviewing your neighborhood HOA covenants before paying any municipal fees. Often, homeowners associations maintain stricter rules regarding materials and dimensions for your Fence Installation than the county itself.
Minnesota incorporates strong state environmental reviews into local zoning, particularly regarding lakeshore development and septic system placements. Fortunately, Minnesota maintains relatively builder-friendly regulations, keeping base permit fees competitive.
This is a planning estimate only — actual fees in Washington County depend on your project valuation. A typical breakdown looks roughly like:
Always confirm exact fees with your local building department before applying.
*Chart represents median application base fees and does not include project valuation percentages.
Office: Washington County Zoning
Address: 11660 Myeron Rd N, Stillwater, MN 55082, USA
Phone: (651) 430-4300
Source: official Washington County government records. Hours and procedures can change — call ahead to confirm.
In Washington County, applications and fees are usually handled through an online permit portal. Your contractor should include their Minnesota Department of Labor and Industry license number to avoid rejections.
When applying for a Fence Installation permit, you or your contractor will generally need to submit the following documentation for the city's review:
Key code points for a Fence Installation in Washington County: Standard US zoning caps residential backyard fences at 6 feet high and front yard fences at 4 feet for visibility, intersection safety, and utility access.
Estimated processing time in Washington County: 2 to 4 weeks.
Building without authorization is considered a code violation. The local government can issue a Stop Work Order, forcing you to halt construction immediately. You may be subject to retroactive permit fees (often double the original cost), daily fines, or even a mandate to tear down the unpermitted work at your own expense.
Yes. Minnesota generally allows property owners to act as their own general contractor under an Owner-Builder exemption. If you take this route, you assume full legal and financial liability and must ensure all work complies with the Minnesota State Building Code.
As a planning estimate, base municipal fees for a Fence Installation permit in Washington County typically fall between $43 and $65. The final amount depends on your project valuation, so confirm the exact figure with the local building department.
Based on the size of Washington County, the typical processing time is 2 to 4 weeks. Times vary with the season and the building department application volume.
You can apply through the Washington County Zoning or online via the county permit portal. For questions, call (651) 430-4300.
Did you recently pay for a permit here? Anonymously share the fee to help our database stay accurate.
Starting work before the permit is issued can lead to double fees and stop-work orders.
Read GuideDemystify local zoning ordinances, setbacks, and land-use rules to ensure your project is legal.
Read GuideEverything you need to know about structural safety, legal compliance, and avoiding fines.
Read GuidePopular tools and materials homeowners use for a fence installation project:
As an Amazon Associate, we earn from qualifying purchases.
Planning another home improvement project? Check the requirements and fees for:
Building near the county line? Check requirements for neighboring areas: