Understanding Zoning Laws: What You Can and Cannot Build
Demystify local zoning ordinances, setbacks, and land-use rules to ensure your project is legal.
Read GuideCheck local building codes, estimate your municipal fees, and review inspection requirements for 2026.
Fence Installation · Union County, Arkansas
In Arkansas, there is no single statewide rule for a Fence Installation; whether you need a permit is decided locally in Union County.
Fences are governed mainly by local zoning, not a statewide building permit. Cities set height limits (commonly 3-4 ft in front yards and 6 ft in back and side yards), setbacks, and corner sight-line rules, and many require a zoning permit for any fence. Most jurisdictions exempt fences up to 7 ft from a building permit (IRC R105.2) and require one above that. Replacing a fence at the same height, material, and location usually needs no permit; a fence used as a pool barrier always does. Because Arkansas leaves this to local jurisdictions, the reliable answer comes from Union County Clerk. Zoning setbacks apply either way.
Source: Local (state buildings only), IRC 2021 · Verified 2026 by StateDataIndex
Installing a new fence can improve privacy and property value. However, most counties require a permit if the fence exceeds 6 feet in height or is located in the front yard.
With a population of around 37,900 residents, Union County generally runs a more streamlined permitting process than major urban hubs.
In high-wind, tornado-prone areas, inspectors strictly verify structural anchoring and framing compliance under the Arkansas Fire Prevention Code.
Regardless of the state permit rule above, Union County still enforces property-line setbacks and local zoning for your Fence Installation. A permanent foundation or any electrical/plumbing hookup can also change what is required, so confirm with Union County Clerk before building.
Arkansas leaves most zoning authority to local city planning commissions. Rural, unincorporated areas frequently operate with minimal to no formal building permit requirements. Fortunately, Arkansas maintains relatively builder-friendly regulations, keeping base permit fees competitive.
Permit fees vary by jurisdiction and by your project's valuation, so there is no single fixed figure for Union County. We only publish fees confirmed by real homeowners — none have been reported here yet.
Confirm the current fee directly with Union County Clerk ((870) 864-1910). If you have paid for a permit here, you can add it here to help others.
Office: Union County Clerk
Address: 101 N Washington Ave, El Dorado, AR 71730, USA
Phone: (870) 864-1910
Source: official Union County government records. Hours and procedures can change — call ahead to confirm.
In Union County, you can begin your application online through the county's permit portal, or submit blueprints and a property survey in person. Including your contractor's Arkansas Contractors Licensing Board license number helps avoid rejections.
When applying for a Fence Installation permit, you or your contractor will generally need to submit the following documentation for the city's review:
Key code points for a Fence Installation in Union County: Standard US zoning caps residential backyard fences at 6 feet high and front yard fences at 4 feet for visibility, intersection safety, and utility access.
Typical processing time for a jurisdiction of this size: 1 to 5 business days (Often over-the-counter).
Building without authorization is considered a code violation. The local government can issue a Stop Work Order, forcing you to halt construction immediately. You may be subject to retroactive permit fees (often double the original cost), daily fines, or even a mandate to tear down the unpermitted work at your own expense.
Yes. Arkansas generally allows property owners to act as their own general contractor under an Owner-Builder exemption. If you take this route, you assume full legal and financial liability and must ensure all work complies with the Arkansas Fire Prevention Code.
Permit fees vary by jurisdiction and by your project's valuation, so Union County does not publish a single fixed figure. Confirm the exact fee with the local building department before applying.
Based on the size of Union County, the typical processing time is 1 to 5 business days (Often over-the-counter). Times vary with the season and the building department application volume.
You can apply through the Union County Clerk or online via the county permit portal. For questions, call (870) 864-1910.
Did you recently pay for a permit here? Anonymously share the fee to help our database stay accurate.
Demystify local zoning ordinances, setbacks, and land-use rules to ensure your project is legal.
Read GuideUnderstand the difference between municipal building permits and Homeowners Association approvals.
Read GuideEverything you need to know about structural safety, legal compliance, and avoiding fines.
Read GuidePopular tools and materials homeowners use for a fence installation project:
As an Amazon Associate, we earn from qualifying purchases.
Planning another home improvement project? Check the requirements and fees for:
Building near the county line? Check requirements for neighboring areas: