StateDataIndex

ADU Guide · Verified 2026

Building an ADU in Idaho

Yes, by right, in cities over 10,000 residents

Idaho requires cities over 10,000 residents to allow one ADU per lot, a brand-new law effective July 2026 that eliminated owner-occupancy requirements entirely. A homeowner has to choose between an internal ADU or a detached one, not both as a simultaneous right.

Quick Facts

Who is covered
Cities over 10,000 population (Boise, Coeur d'Alene, Post Falls, Nampa, Meridian, and others)
Owner-occupancy
Eliminated entirely at the city level, a change from the prior law
Structure
Choose ONE: internal ADU or one detached ADU per lot, not both as a simultaneous right
Size floor
Larger of 1,000 sq ft or 75% of primary dwelling (cities cannot go below this)
Local compliance deadline
February 1, 2027
Prior law (HB 166)
Only addressed HOA restrictions on internal ADUs; detached units and owner-occupancy were not covered until SB 1354

Statewide floors set by SB 1354, signed March 31, 2026, effective July 1, 2026, Idaho Code 67-6541. Your city may be more generous but cannot go below them.

The Three Types of ADU

Internal ADU Within the primary home or its garage. Choose this OR a detached unit, not both.
Detached ADU One structure, sited in the rear yard. Choose this OR an internal unit, not both.

A very recent law with a real effective date

SB 1354 was signed March 31, 2026 and took effect July 1, 2026, making it one of the newest statewide ADU laws covered in this entire research, current as of just a few months before this writing.

A genuinely distinctive "choose one" structure

Unlike most states in this research, which protect both an internal and a detached ADU right simultaneously, Idaho's SB 1354 protects only one ADU per lot total, a homeowner must choose between an internal unit or a single detached structure, not claim both rights at once.

A size direction that runs the less common way

Cities cannot limit an Idaho ADU below the larger of 1,000 square feet or 75% of the primary home, the same "larger of" direction Iowa and Vermont use, rather than the more common "smaller of" rule found in states like Arkansas or Montana.

A real improvement over the prior law

The earlier HB 166 only addressed HOA restrictions on internal ADUs specifically, and still let cities require owner occupancy for those units, while leaving detached ADUs entirely up to local discretion. SB 1354 is a genuinely broader law that closes both of those gaps.

What people get wrong

The most common mistake is assuming SB 1354 lets a homeowner build both an internal ADU and a detached one. It protects only one per lot, the homeowner has to pick.

From Idea to Move-In: The Timeline

Confirm city population threshold 1 week SB 1354 applies only to cities over 10,000 residents.
Choose internal or detached path 1 week Only one ADU per lot is protected, not both simultaneously.
Design & plans 3-8 weeks Must meet the larger-of 1,000 sq ft/75% size floor.
Permit review 4-8 weeks Administrative approval only, no discretionary review.

Building It Yourself? Here's What You'll Need

Planning an ADU? Tools homeowners use in the design and layout phase:

As an Amazon Associate, we earn from qualifying purchases.

Check Your Local Rules

Your city may allow more than the state floor

State law sets the minimum; many Idaho cities and counties are more generous. Browse the full directory of 44 counties and every city in Idaho for local rules, fees, and building department contact details.

Browse the full Idaho directory →

Not sure if your project needs a building permit, a zoning approval, or both? See our guide to building permits vs. zoning approval.

Official Sources

ADU law changes frequently and local ordinances add detail. This guide is general information, not legal advice, always confirm with your local building department. Reviewed by the StateDataIndex Editorial Team · Updated September 2026.